Pipe and Fabric
The crew from Q Design was out last night to install the pipe and fabric for the Celebrate Christmas concert tomorrow evening. The setup seemed to go much faster this year. We started at 9pm and we were finished by 10:30pm. As usual, the folks at Q Design did a great job.
Today will be focused on getting the sound, lighting and multimedia equipment loaded, installed and configured. Today and tomorrow will both be long days.
Leave a Reply
Want to join the discussion?Feel free to contribute!