Water?
New update from the job site:
Just chatted with Jeff. They have located the coupling that had completely separated. There was about a 3 foot separation between tube ends. They are just attaching the brass couplings (they had to add a tube length to join them together). He expects we will have water shortly. He told me this was the most difficult job he has ever done (don”™t know if he meant ever or lately).
Leave a Reply
Want to join the discussion?Feel free to contribute!